- 1. About ZenTao Max
-
2. Installation
- 2.1 Choose the Proper Installation Method
- 2.2 Windows
- 2.3 Linux
- 2.4 Source Code
- 2.5 Example: Source Code Installation
- 3. Upgrade
-
4. New Concept
- 4.1 Program
- 4.2 Project
- 4.3 Product
- 4.4 Management Model
- 5 Navigation Bar Adjustment
- 6 Privilege Adjustment
-
7. Project
-
7.1. Project General Function
- 7.1.1 Basic Seetings of Project
- 7.1.2 Execution
- 7.1.3 Software Requirement
- 7.1.4 Bug, User Case, Test Request, and Test Report
- 7.1.5 Document
- 7.1.6 Buid and Release
- 7.2. Waterfall Project Function
-
7.1. Project General Function
- 8 Asset Repository
- 9 Modify Record
Project
- 2021-05-13 09:19:48
- Taotao
- 996
- Last edited by Hongyan on 2022-03-21 15:01:01
- Share links
The project is to complete the various tasks of the project within the schedule, budget, and quality objectives. It belongs to the concept of the strategic level.
Projects in ZenTao Max are different from previous versions. The projects in the old version represent a specific Sprint or iteration, while a project in the Max version can be multiple sprints or iterations. This upgrade will convert the project in the old version into an iteration or phase of a project in the new version.
Write a Comment